Coordinate occupied spaces
What changes should trigger a review of the next demolition shift?
Review the shift when a change affects its removal boundary, retained operations, access or supporting instructions. A familiar work area can become a different planning problem after a tenant returns, a route closes or a drawing changes. Yesterday's plan should not be treated as automatic approval for today's conditions.
SiteClear planning resources / Reviewed 8 October 2026

Compare conditions with the issued plan
Ask the project contact to identify changes since the last review, including occupancy, deliveries, services and other contractors. Record the affected location and activity. A general note that conditions changed gives the team little basis for deciding what needs attention. Keep observations separate from the direction needed to proceed.
Identify the affected dependency
A blocked loading bay may affect material movement, while a new retained item changes the removal boundary. Route each issue to the person responsible for that decision. The demolition team can assess its sequence once the required information is available. Do not treat a schedule target as authority to bypass an unresolved condition.
Issue a revised shift instruction
State what remains released, what is held and what the team should use as the current reference. Make sure management, security and any affected next shift receive the update. This guide concerns reassessment after a change, rather than the initial go/no-go review. It helps keep a live occupied-building plan connected to the conditions actually encountered.