Plan your demolition
A clearer plan.
A better brief.
Start with the decision in front of you. These guides help owners, managers and contractors prepare the information a demolition assessment needs.
Start here
Working in an occupied building?
Confirm the removal boundary first. Then coordinate access, the work window and the condition that shared spaces must be returned in.
Choose a commercial renovation scope
Grocery-store refurbishment after specialist equipment removal
Grocery refits combine ordinary shop interiors with equipment that requires its own providers.
Compare the demolition needed before choosing a commercial unit
Two premises with similar floor areas can need very different removals for the same business.
Commercial ceiling removal before a refit
A ceiling replacement needs a clear distinction between the visible finish, its supporting assembly and the separate building devices around it.
Ordinary demolition for a theatre or cinema refurbishment
A venue refit can involve foyer counters, corridor finishes and auditorium interiors while retaining the stage, raked structure and specialist systems.
Ordinary interior removals after a restoration release
Following a restoration event, ordinary demolition should start from the responsible restoration team's findings and release.
Interior demolition when office and retail uses change
Office-to-retail and retail-to-office projects can need different removals even in the same unit.
Demolition for a private training-centre refurbishment
A training-centre layout can change teaching rooms, reception and support areas without requiring a complete interior reset.
Demolition within a vacant childcare-premises renovation
Vacant childcare premises may be renewed for a similar layout or adapted for a different use.
Community-facility refurbishment: ordinary rooms and retained building features
A community building may need new offices, meeting rooms or kitchen areas while retaining significant fabric elsewhere.
Pool-area refurbishment: ordinary interiors around a retained pool
A pool-area renovation can renew changing rooms and adjoining interiors without removing the pool.
The demolition contribution to a commercial-to-residential conversion
Demolition planning follows the responsible team's conversion feasibility and design decisions.
Commercial laundry refit: when does the building need demolition?
A laundry equipment replacement may need no separate building demolition.
Plan a residential renovation
Demolition packages for several lawfully vacant apartments
Several vacant apartments need not share one removal scope.
Planning an interior gut across a whole house
A whole-house interior renovation needs a floor-by-floor removal map, even when the project is described as a complete gut.
Opening apartment interiors for a building-wide riser renewal
Riser replacement starts with the specialist's service route.
Returning a divided house to a single-home layout
Combining a divided house involves more than removing a second kitchen.
Showing 81 to 96 of 110 guides. Browse by task or continue through the collection.
