Plan your demolition

A clearer plan.
A better brief.

Start with the decision in front of you. These guides help owners, managers and contractors prepare the information a demolition assessment needs.

Start here

Working in an occupied building?

Plan a residential renovation

Define concrete and building changes

Replacing large equipment: plan the opening and what happens after it is used

Compare existing access, a temporary opening and a permanent alteration for equipment replacement. Define concrete removal, retained structure and closure work.

Concrete removals for charging infrastructure at an existing property

A charging retrofit may need only local concrete changes, or it may coincide with a wider parking-area renewal.

Concrete removal before industrial equipment replacement

An equipment replacement does not always require its existing base to leave.

Concrete removal in a below-grade parking area

Parking-garage concrete removal should follow the rehabilitation team's defined scope.

Commercial stair removal during a renovation

A staircase can be part of the building's structure and circulation, not simply a large interior fixture.

Concrete and interior removals for a commercial lift retrofit

A lift retrofit can require building openings and surrounding interior removal, but the lift supplier and design team must establish the arrangement first.

Concrete removals before a commercial forecourt is rebuilt

A forecourt renewal may replace selected kerbs and walks or change a connected area around the entrance.

Industrial concrete removal during a planned shutdown

A facility closure window is not the same as a released demolition area.

Toronto concrete-work handover: responsibility for slurry and wastewater

Concrete work can produce material and water that need a defined collection and destination arrangement.

Showing 97 to 110 of 110 guides. Browse by task or continue through the collection.

Call nowFree estimate